On June 25th, the day after I returned home from the hospital after having a total right knee replacement, our washer leaked. Several repairs later, the damn thing is leaking again. Monday, my wonderful DH, called Sears to talk to someone about getting some satisfaction on this machine. On reading our contract, one of the options was a refund of the Master Protection Agreement. Or at their discretion a replacement - which could ultimately be a rebuilt machine. Now why would we want to replace a defective machine with the same thing? Not an option for us. Neither is having the same company come out and repair it. If they haven't fixed it yet, why try again. And apparently Mr. Appliance, the contract repair company, has not reported all the service calls and parts replaced. So Sears is saying we've only had repair three times. Not so. They also told DH that if we haven't heard from them in 48 hours, we should call them back. I don't know why, since no one from Sears ever returns our calls. They just pass it on to the repair company.
This is a washer that is four and a half years old. We bought it because we were so happy with our previous Kenmore washer. Sorry to say that this one did not live up to its predecessor.
Copyright 2008-2012, ACK, for Generational
Wednesday, November 7, 2012
Sunday, October 28, 2012
Good Days vs Bad Days
I think I've finally turned the corner on my right knee rehab. I've noticed over the last week that I've had more good days than bad! I've been able to sit in the car longer and not cringe with pain on getting out. Part of that is that I can and do move my right leg a lot in the car to keep from getting stiff. I've been able to work on cards and genealogy although it is still easier to get up from the office desk chair than the craft desk chair - mainly due to the presence of arms on the office chair! With the exception of my sometimes wonky blood sugar I feel almost back to my normal self. One of these days I'll be glad I had this done.
Copyright 2008-2012, ACK, for Generational
Copyright 2008-2012, ACK, for Generational
DE-Construction
DH and I had talked about expanding our deck before we got our spa. The bad thing was the timeline. Instead, we went with a cement slab - and sidewalk - and additional slab (future fire pit.)
Since then, our favorite builder (Turner Homes of Tennessee) had some time to spare ... the upshot is that our deck is growing about 3+ feet on one side and 2 feet all across the front. So we are going from 12 x 16'7" to 14 x 20. Here are before and during shots. I remember how big our deck looked when we first moved in.
And here we are down to just an egress route - which enables us to still use the spa in the interim. The front will extend to the edge of the concrete and 3+ feet on the right. That is the guest room on the right.
It's being replaced with Timbertech in our ongoing effort to become maintenance free. Now if the weather cooperates!
Copyright 2008-2012, ACK, for Generational
Since then, our favorite builder (Turner Homes of Tennessee) had some time to spare ... the upshot is that our deck is growing about 3+ feet on one side and 2 feet all across the front. So we are going from 12 x 16'7" to 14 x 20. Here are before and during shots. I remember how big our deck looked when we first moved in.
![]() |
| Everything off but the grill! |
![]() |
| Gotta watch your step! |
And here we are down to just an egress route - which enables us to still use the spa in the interim. The front will extend to the edge of the concrete and 3+ feet on the right. That is the guest room on the right.
It's being replaced with Timbertech in our ongoing effort to become maintenance free. Now if the weather cooperates!
Copyright 2008-2012, ACK, for Generational
Subscribe to:
Posts (Atom)

